We use cookies

We use cookies on our website, some of which are essential, while others help us improve our website and thus your experience.

  • Essential
  • Statistics
  • Marketing
  • External Media

+ Privacy Settings

+ API

Google Tag Manager, mouseflow, matelso

This, for example, applies to tracking tools such as Google Analytics, Facebook Pixel, Mouseflow Pixel, IVW Pixel, Twitter etc.

Google Analitycs (click here) / mouseflow (click here) / matelso (click here)

+ Video Plattformen

YouTube

Official website: Google (click here)

+ Route Planners

Google Map

Official website: Google (click here)

menu

References + Case Studies

From the Hilton Hotel to a shopping centre – with brief project descriptions and photos of the different construction stages we show you what’s possible – from A to Z.

Shopping Centre, Croatia

Project Description

For the expansion of the largest shopping centre of Croatia, a Supercut XP system was installed on site and operated in two shifts. In total, approximately 15,000 linear metres of mouldings were installed.

The deployment of this system made it possible to precisely meet the schedule – all our work processes were completed even 6 weeks prior to the planned deadline.

 
 

Hilton, Berlin, Germany

Project Description

For the expansion work in the Hilton hotel in Berlin, Germany, a Supercut XPS system was installed on site to realize the complex ceiling constructions in a professional and timely manner. All folding elements were milled there and installed directly.

With our Supercut XPS we were able to realize the sophisticated ceiling constructions as well as all necessary folding elements in perfection.

[Translate to English:] Supercut XPS - Hilton Berlin
 
 

FAF Trade Show, Cologne, Germany

 
 
 
FAF Farbe Ausbau Fassade 2013 in Köln Phantasiewelten
youtube